After being invited to tender after a successful installation in 2020, Creative spark won the contract at the beginning of 2021 to remove the old, failing house light system for a brand-new LED track lighting system with intelligent dimming and dedicated control panels.
The new installation has massively reduced the electricity consumption and has removed the need for regular lamp changes, along with providing a bright even coverage across the auditorium space. The new installation consists of 166 individual LED fixtures, controlled by sleek wall panels around the space, or from the lighting console.
Photos
More Case Studies
Lighting and Sound Upgrade
Upgrading the technical set-up in the Main Hall at Smithdon High School in Hunstanton
School Auditorium House Light Upgrade
Updating the house lighting in the school auditorium at Woldingham School in Surrey
Drama Classroom Lighting
Theatrical lighting installation for drama classrooms at Springwood High School in Kings Lynn, Norfolk



